A 20-inch scrubber costs $1.10 an hour to own and run, machine and chemicals together. Here is the arithmetic from purchase price to the $28.50 a machine-hour that belongs in a hard-floor bid.

Industrial floor scrubbers and a burnisher parked on a loading dock
Photo: Z22 / Wikimedia Commons (CC BY-SA 4.0)

A commercial floor machine costs a cleaning contractor $1.10 an hour to own and run, all in: $2,200 to buy, about $1,100 a year in parts, upkeep and consumables, worked 1,500 hours a year and replaced every four years. That is $0.93 of equipment and cleaning chemicals for every labour-hour the machine covers. A 20,000-square-foot nightly scrub therefore carries $405 a month of equipment cost that never shows on a supplier invoice — and at an 8% equipment line it is the difference between a bid at $26 an hour and one at $28.50.

Those are planning assumptions, written out so you can argue with them. The number that matters is the method.

Own the machine, per hour

The model machine is a 20-inch walk-behind auto-scrubber, bought new for $2,200, financed over 48 months at 7% APR — $52.67 a month, $2,527.95 paid in total, so $328 of that is finance cost. It runs 1,500 hours a year: six hours a night, five nights, 48 weeks after holidays. It is replaced at four years, well before the frame gives out, because a machine that fails on a contract in month 40 costs more than a new one.

LineAmount over 4 yearsPer machine-hour
Purchase price$2,200$0.367
Finance cost ($52.67 × 48 − $2,200)$328$0.055
Brushes and pad drivers ($180 a year)$720$0.120
Squeegee blades ($95 a year)$380$0.063
Battery set replaced twice ($550 each)$1,100$0.183
Belts, hoses, cords, one service call ($140 a year)$560$0.093
Repair reserve at 5% of price a year$440$0.073
Total$5,728$0.954

Work the same machine twice as hard — 3,000 hours, maybe two shifts or a hospital account — and the same $5,728 spreads over 12,000 hours: $0.48 an hour. Let it sit at 900 hours a year, the way a machine does when a portfolio shrinks, and it climbs to $1.59. Ownership cost is a function of the hours you put through it, not of the price tag, so a "cheap" machine that runs 900 hours a year is more expensive per hour than a good one that runs 2,500.

The chemicals and pads that go through it

ItemAnnual spendPer machine-hour
Floor pads, four sets a year at $55$220$0.147
Neutral floor cleaner, 5 gallons of concentrate at $42$210$0.140
Degreaser for spot work, half a case at $95$48$0.032
Total$478$0.319

Pads are the line owners underestimate. Four sets a year assumes a crew that changes a pad when the machine starts to chatter; a crew that runs a pad to nothing on waxed VCT burns a set every six weeks, which is $0.30 an hour on pads alone and roughly doubles the consumable line.

Machine plus consumables: $1.10 an hour, or $1,660 a year per machine.

Put it into the hourly rate

Labour sets the scale of everything else here. BLS puts the mean hourly wage for janitors and cleaners (SOC 37-2011) at $18.64 for May 2025; at the 22% payroll burden used throughout this publication's pricing work, a cleaner costs $22.74 a loaded hour. Add the machine and the chemicals:

LinePer labour-hour
Loaded labour$22.74
Floor machine and consumables$1.10
Direct cost$23.84
Supervision and admin at 12%$26.70
Equipment and depreciation at 8%$28.84

Bid hard-floor work at $28.75 to $29.00 a machine-hour rather than carrying the $26 figure used on restroom and dusting scope. The 8% equipment line is inside the 8–12% that contractors who own their machines tell you they carry; below 5% the fleet is being paid for out of margin.

A short conversion, since bids are quoted per square foot: the 20,000-square-foot office at 21.67 visits and $0.242 a square foot a month is $0.134 a square foot per visit. At 4,000 square feet a machine-hour, a 20-inch scrubber costs $0.0072 a square foot on a nightly scrub — 5.4% of that visit price, which is what the 8% line covers and then some.

Which machine, at what cost

20-inch walk-behind scrubber20-inch auto-scrubber24-inch burnisher
Price range$1,800–$2,600$4,500–$9,000$2,500–$4,000
Ownership and consumables, per hour$1.10$1.60–$2.00$0.80–$1.00
Planning production, square feet an hour4,0008,00012,000
Cost per square foot, loaded labour included$0.0072$0.0045$0.0029

The auto-scrubber earns its price on hard floor: double the production for 1.5× the hourly cost, so it wins on any building with more than about 12,000 square feet of hard floor scrubbed five nights a week. A burnisher at 12,000 square feet an hour looks cheapest per square foot and is the easiest machine to buy for the wrong reason — it protects a finish, it does not win bids.

What the price indices say

BLS producer price indexOct 2019Oct 2026Change
Janitorial services (NAICS 561720)145.6189.663+30.3%
Soap and other detergent manufacturing (325611)179.4245.957+37.1%
Polish and other sanitation goods (325612)213.5265.343+24.3%
Commercial machinery and equipment repair and maintenance (WPU1141)267.3416.185+55.7%

Chemicals and repair labour have both outrun the price a contractor gets for the service, and repair has outrun it by nearly two to one. That gap is the whole argument for a standing equipment line in the bid rather than treating machines as a cost you absorb and worry about later.

Before the bid goes out

  1. Count hard floor, not carpet. Equipment cost rides only on the square feet a machine touches.
  2. Use the production rate you will actually hold. 4,000 square feet an hour on a walk-behind over tile; take 20% off if the route crosses three floors and the machine has to ride a lift.
  3. Turn hours into dollars at $28.75–$29.00 and print it as its own line; buyers query a vanished equipment charge faster than they query $2.50 an hour.
  4. Keep the equipment line at or under 12% of the contract value. Above that you are financing a capital purchase through an operating agreement, and a sharp buyer will price it out.
  5. Put the replacement year in the file. The four-year clock is what turns a good contract into a bad one when a machine dies in month 40 and no money was set aside.

Sources: BLS OEWS May 2025 mean hourly wage, janitors and cleaners (series OEUN000000000000037201103, retrieved from the BLS public API); BLS PPI October 2026 (PCU561720561720, PCU325611325611, PCU325612325612, WPU1141). Machine prices, maintenance, consumable spend and production rates are planning assumptions, not survey results.

About the author

Alex V.

Alex came to The Cleaning Trade after years of writing for online publications. He covers the business side of commercial cleaning: how contracts are bid and won, what crews are paid, and the rules that shape the work. Away from the desk, he's a keen distance runner.

Newsletter

Get new stories by email.

More from The Cleaning Trade

Nov 27, 2026

How Much Does Commercial Office Cleaning Cost per Month?

Nov 26, 2026

What Should a Commercial Cleaning Contract Renewal Cost in 2027?

Nov 24, 2026

How Much Does Post-Construction Cleaning Cost per Square Foot?