Short answer: a cleaning bid is twelve lines, and if eleven of them are prose with one number at the bottom, the number is a guess. The three that decide whether you make money are the measured square footage by area type, the production rate behind the hours, and the payroll burden on the wage. Everything else protects those three — from the buyer, from the next vendor, and from your own account manager six months from now.
Here is the list, in the order a property manager reads it.
| # | The line | What goes in it | What it protects |
|---|---|---|---|
| 1 | Scope boundary | What is cleaned, and what is explicitly excluded, with the owner of each excluded task named | The argument in week three |
| 2 | Square footage by area type | Measured area per type — office, restroom, break room, corridor, stairwell, warehouse, exterior — usable not gross, with exclusions listed | A 20% error on your biggest multiplier |
| 3 | Frequency matrix | Visits per week and tasks per visit, by area type | Pricing a warehouse like a lobby |
| 4 | Production rate | Square feet per labour hour, for each area type, in writing | Hours that exist only in the buyer's imagination |
| 5 | Labour hours per visit | Square footage ÷ production rate, plus the fixed tasks: trash route, restroom count, floor care | A number nobody can rebuild from the document |
| 6 | Wage rate by classification | The rate you will actually pay in that market, with the survey and the date | A bid priced from a wage you cannot legally pay |
| 7 | Payroll burden | FICA at 7.65%, FUTA, state unemployment rate, workers' compensation rate, paid time off — as one stated percentage | The most-omitted line in the industry |
| 8 | Consumables | Included or excluded, who supplies, to what standard, at what monthly allowance | Paper and soap quietly eating 6% of the price |
| 9 | Equipment and floor care | Who owns the machines, who maintains them, which tasks are billable at what unit rate | Surprise invoices and surprise exclusions |
| 10 | Supervision | Hours per week on site, who the account manager is, response time | A "supervised" crew nobody has ever met |
| 11 | Escalator and term | Index, anniversary, cap, floor, notice period, termination for convenience | Three years of margin erosion |
| 12 | Insurance, bonding, licensing | Limits, additional insured, background checks, recordkeeping, subcontractor disclosure | Losing the award on paperwork |
Measure line 2, do not ask for it
Ask a buyer for the square footage and you will get the rentable number from the lease, which includes the mechanical room nobody cleans, the tenant's private suite you never enter, and the corridor you clean twice a night. Walk it. Measure office, restroom, break room, corridor and stairwell separately, and write each number down with the date you measured it. A restroom is not priced by square footage at all — it is priced by fixture count and visits — so a bid that folds restrooms into a total square footage has already lost the argument it is about to have. When the areas differ from the lease, say so in the bid, in one sentence, with both numbers. Buyers respect it and the next vendor inherits the argument instead of you.
The three lines that decide the number
Take a 20,000-square-foot office at 3,000 square feet per labour hour: 6.67 hours a visit, 21.67 visits a month at five nights a week, 144.5 hours a month. At the May 2025 national mean hourly wage for janitors and cleaners of $18.64, loaded by 1.22 for payroll burden, that is $22.74 an hour and $3,286 of labour. At labour at 68% of price, the bid is $4,832 a month — $0.242 per square foot.
Now change one line. At 2,500 square feet per hour the same building needs 8 hours a visit, 173.3 hours a month, $3,941 of labour, and a price of $5,796 — $0.290 per square foot. Same building, same wage, same margin, 20% more. That is why line 4 belongs in the document and not in your head, and why a bid that states only the price invites the buyer to assume your production rate is whatever the cheapest bidder claims. The full arithmetic, including how the number moves with burden and frequency, is in what office cleaning costs per square foot in 2026.
Line 7 is the one that gets skipped because it is boring. FICA is 7.65% before you have paid a single state unemployment rate or workers' compensation premium, and those two vary enormously — a low-rate contractor and a high-rate one can differ by five percentage points on the same wage. If your bid shows a wage and no burden, the buyer will eventually compare it with a bid that shows both, and yours will look cheap for a reason.
What belongs on page one
Buyers do not read bids front to back. They read the summary, then check whether the summary survives contact with the detail. Put these on page one: monthly price, price per square foot, hours per visit, visits per week, term, and the date of the wage survey the price is built on. Six numbers, one page, all rebuildable from the pages behind it.
What buyers actually check
Three things, in this order. Can the hours be rebuilt from the scope and the production rate? Does the wage match the market it is being paid in — your loaded labour rate is the number they will test it against. And does the escalator match the cost structure, because a contract that is 68% wages cannot be escalated on a general index and stay whole — which is how the escalator clause ends up deciding the profitability of the whole term.
The line you should not put in
Do not lead with an hourly rate. An hourly rate invites the buyer to buy hours, and hours are the one thing they can cut without cutting the scope on paper. Lead with the monthly price and the hours behind it, so the conversation is about the building rather than the clock. Where a buyer insists on a rate, quote the loaded one and say what is in it.
Line 11, in one sentence
Write the escalator as the OEWS mean wage for janitors and cleaners in this state, published each May, applied on the contract anniversary, with a floor of zero and a cap of five per cent. Anything vaguer — annual increase as agreed, CPI — is a clause that will be argued about in year two by two people who will not remember the conversation.
The check before you send it
Read your own bid as if you had to take over the building on Monday with nothing but the document. Can you price it? Can you staff it? Can you tell what you are not doing? If any of those three answers is no, the missing line is on the list above — and your walk-away number is the floor the whole document has to clear before it is worth sending. A bid that wins at the wrong number is not a win; it is a contract that your contract book will carry at a loss for three years.

